Oyala Twin Tower – Equatorial Guinea

  • Project :
    Oyala Twin Tower – Equatorial Guinea
  • Project Details :

    - Design and engineering works,

    - Contracting (Construction) works of low voltage(LV) and weak current systems,

    - Contracting(Construction) works of the Professional A/V and Broadcasting Systems

    - Total area : 25.000m2

    - Duration  : 18 months